BOQ software for Indian construction firms
Build BOQs from reusable rate libraries, lock the client-signed version, link items to project milestones, track change orders, generate the final running bill — all from one record.
14-day free trial · Cancel anytime · GST-native from day one
BOQ in Excel is fast to start and impossible to maintain. Item codes drift, rates fork across projects, change orders sit in WhatsApp screenshots, and the final bill never reconciles to the signed quote. Rebaar treats the BOQ as a structured document with rate-library inheritance, signed-version locking, and direct linkage to the billing pipeline.
What you actually get
Rate libraries — central, reusable
One rate library per workspace (or per region). Edit a unit rate once; every BOQ that references it picks up the change for unsigned lines only. Signed BOQs stay frozen.
Signed-version locking
Once the client signs a BOQ, the version is locked. Edits create a Change Order — visible, audited, requiring re-sign. No more "did we agree to ₹4,200 or ₹4,500 per sq ft?" arguments.
CSI / NIC-format hierarchy
Sections (Civil, MEP, Finishes) → Groups (Foundation, Walls, Floors) → Items (RCC M25, brickwork 230mm, etc.). Each item carries quantity, unit, rate, GST slab, HSN code.
Direct link to invoicing
Each BOQ line connects to milestones. When a milestone is achieved, the line's billable amount flows into the next RA bill automatically. No manual re-keying.
Change orders with approval chain
Site discovers a hidden footing requires extra excavation. PM raises a change order, Owner approves, client e-signs (or signs on print). The change order becomes a line in the next bill. Audit trail records every step.
BOQ vs BOM
Bill of Quantities is for the client (sold). Bill of Materials is for procurement (purchased). Rebaar maps each BOQ item to a recipe of materials with wastage factors — so as the BOQ progresses, the indent for materials is one click away.
Export to client-friendly PDF
Client receives a branded PDF with section totals, GST breakdown, payment schedule. Rebaar wordmark optional (white-label on higher plans).
Quote → BOQ → Contract → Bill chain
Each artefact derives from the previous. The contract carries the signed BOQ as the agreed scope. Subsequent bills reference contract lines. No CSV between modules.
BOQ tools comparison
| Feature | Rebaar | Excel + manual |
|---|---|---|
| Rate libraries — reusable across projects | ✓ Yes | Copy-paste between sheets |
| Signed-version locking | ✓ Yes | — No |
| Direct link to RA bills | ✓ Yes | — No |
| Change orders with approval chain | ✓ Yes | |
| BOQ → BOM mapping with wastage | ✓ Yes | Separate sheet |
| Multi-project, multi-version | ✓ Yes | File-per-project |
| Audit trail per line edit | ✓ Yes | — No |
| GSTIN / HSN per line | ✓ Yes | Add manually |
Based on publicly available product information at time of writing. Competitor features evolve — verify before signing.
Frequently asked questions
What is a BOQ in Indian construction?
A Bill of Quantities (BOQ) is a section-by-section breakdown of work items, quantities, unit rates, and GST applicable to a construction contract. It's typically prepared by the architect/quantity surveyor and forms the basis of the client contract, milestone billing, and project P&L.
How is BOQ different from BOM?
BOQ (Bill of Quantities) is what you sell — work items with rates payable by the client. BOM (Bill of Materials) is what you buy — raw materials, fasteners, consumables, with wastage allowances. Rebaar maps BOQ items to BOM recipes so procurement and billing stay aligned.
Can I import a BOQ from Excel?
Yes. CSV import accepts the standard BOQ columns (section, item description, unit, quantity, rate, HSN). The import builds the structured BOQ in Rebaar; you can edit, lock, and progress-bill from there.
What happens to the BOQ when a change order is raised?
The original signed BOQ stays locked. The change order is a separate, audited artefact — once approved, it adds (or subtracts) lines that flow into subsequent RA bills. The final contract total = original BOQ ± all approved change orders.
Does Rebaar handle item rate analysis (the labour + material breakdown)?
Yes. Each rate library entry can carry its labour-rate, material-rate, plant-rate, and overhead components. Useful for tendering and for understanding margin pressure when a vendor quote shifts.
Can multiple estimators work on a BOQ?
Yes. Role-based access: Estimators edit drafts, PM approves, Owner signs. Multi-user editing with last-write-wins on individual lines (locked version is conflict-free since edits go through change orders).
Is the rate library shared across the company?
It can be. One central library is the default — every BOQ inherits. You can clone a region-specific library (e.g. Bangalore vs Hyderabad rates) and assign to specific projects. Changes flow forward, not retroactively into signed BOQs.
How does the BOQ connect to the RA bill?
When you raise an RA bill, you mark which BOQ lines have progressed and by what percentage. The bill shows cumulative work done, this-bill amount, retention, advance recovery. The BOQ's billed-percentage updates automatically — so the next RA bill knows what's left.
BOQs that connect to the rest of your project
Stop maintaining BOQ in Excel and bills in another sheet. One record, end to end.